Project Information:

Project Information: Al udeid American Air Base; To the west of Qatar is 40 km from the capital Doha. The construction of the base was completed in 1997. 2. Stage Additional facility is planned to be made 23 blocks, support facilities and water tanks. On the basic and subasman curtains; Precast wall and flooring system will be applied. Building Project; The conventional system is designed as reinforced concrete. Employer: TEDESCHIA Construction Enterprises Total Construction Area: 36.742 m² Work Scope: Crude Structure Works (Sub -contractor) Duration of the Work: Start / May 2020 - End / August 2020