Al udeid American Air Base; To the west of Qatar is 40 km from the capital Doha. The construction of the base was completed in 1997. The 1st ETAP consists of accommodation and cafeteria facilities, which are planned to be made 10 blocks as an additional facility. On the basic and subasman curtains; Precast wall and flooring system will be applied. Building Project; The conventional system is designed as reinforced concrete. Employer: TEDESCHIA Construction Enterprises Total Construction Area: 63.480 m² Work Scope: Crude Structure Works (Sub -contractor) Duration of the Work: Start / January 2019 - End / March 2020