html Required meta tags Google Fonts Stylesheets Timka Yapı
Explanation
Timka Yapı
CURSOR START
CURSOR END

Picture description

Project Information:

Tüpraş Center Automation Building Project, which has a closed area of ​​5,350.00 m² in Körfez district of Kocaeli province, is located in Mesa Mesken Sanayii A.Ş. It was made under the employer. The building is designed as an explosion -resistant reinforced concrete structure. 9600 m³ high -strength self -settlement ready -made concrete and 1200 tons of structural steel were used. The explosion -resistant door, windows and lights, high -level heat and water insulation made the building featured. Water leakage perceived green roof tracking system, light concrete exterior coating and flooring of fiber mixture, the sound insulation limit> 80 dB in all neighborhoods has given the quality of the project. A1 Class Fire Sealing in all neighborhoods, earthquake -resistant acoustic wooden walls and ceiling, 80cm height earthquake -resistant flooring system, 24/7 air conditioning, 24/24 dynamic lighting system and building management system has made the project into a full automation building. The project reinforced concrete was completed with conventional system mold. Employer: Mesa Mesken Sanayii A.Ş. Total Construction Area: 5.350 m² Work Scope: Crude Structure Works (Sub -contractor) Duration of the Work: Start / April 2014 - End / August 2014

TO US
You can reach

NAME
NUMBER
E-MAIL
MESSAGE
Javascript