html Required meta tags Google Fonts Stylesheets Timka Yapı
Explanation
Timka Yapı
CURSOR START
CURSOR END

Picture description

Project Information:

Port Alaçatı; It is built on a swampy land in the south of the Çeşme peninsula of İzmir, to the west of Karşıyaka Azma. After the establishment of the Kutlu Aktaş Dam, this region of perseverance, which was deprived of the fresh water flow, was no longer no longer being the accommodation point of fishing and fisheries and migratory birds. With the start of the Port Alaçatı project, the breeding in its natural determination was gradually; Clean water flow was provided to the region. The history of the project begins on the famous Cote d’Azur coast of France. Port Grimaud, a settlement project that started in the 1960s, is a project that has signed many principles in terms of breeding a swamp in a river's mouth and having a port placement in the Mediterranean through channels. Port Grimaud's architects discovered the land where Port Alaçatı was located years ago and served as the architectural and technical consultant of Port Alaçatı. All the fronts are different and original, each building has only its own personality. All of the services already given and planned to be provided have been realized for this purpose. 18 -hole golf fields, shopping, schools, health centers, such as elements. 12 villas were completed in the commitment of the project. Employer: Alaçatı Construction Trade Ltd. Ltd. Total Construction Area: 19.735 m² Work Scope: Crude Structure Works (Sub -contractor) Duration of the Work: Start / September 2011 - Finish / April 2012

TO US
You can reach

NAME
NUMBER
E-MAIL
MESSAGE
Javascript